Monday, July 20, 2009
toto toilets
Thursday, July 16, 2009
excavation, continued
Saturday, July 11, 2009
excavation
Saturday, July 4, 2009
setting the t.o.c.
today we were setting the top of concrete elevations. since we dont own transit, we used bucket and hose method. first we set horizontal plane by defining same elavation at each corner. than theese reference points were used to rise or lower the floor plane as we needed it. once we got hold of this methot, it was easy and quick process. even more precise than transit.
Friday, July 3, 2009
so it begins