Saturday, July 4, 2009

setting the t.o.c.

today we were setting the top of concrete elevations. since we dont own transit, we used bucket and hose method. first we set horizontal plane by defining same elavation at each corner. than theese reference points were used to rise or lower the floor plane as we needed it. once we got hold of this methot, it was easy and quick process. even more precise than transit.

the whole miracle is hose, on one end attached to the bucket, on the other end to a clear plastic tube. add water and it will seek its level.

No comments:

Post a Comment